Page 43 - Construction_Opportunities_June_2024
P. 43

TICKER TAPE
        MUDARIA RAILWAY STATION’S THIRD LINE TO ENHANCE    improvements bolster economic growth and create new job
               PASSENGER AND FREIGHT EFFICIENCY            opportunities, especially through initiatives spearheaded by
       The introduction of a third line at Mudaria Railway Station, located   entities like the JK Group.
       on the Bilaspur-Katni line under the Bilaspur division of South East   “The commitment of South East Central Railway (SECR) to expand  INFRASTRUCTURE
       Central Railway (SECR), marks a significant advancement in   rail infrastructure through projects like tripling and quadrupling of
       enhancing the operational efficiency for both passenger and   rail lines demonstrates our dedication to meeting the evolving
       freight services in the region. According to an SECR spokesperson,   needs of passengers and industries alike,” noted the SECR
       this development is poised to efficiently handle the increasing   spokesperson. Upcoming inspections by the NI (Northern India)
       freight traffic and provide smoother routes for coaching and   and CRS (Commissioner of Railway Safety) are anticipated to
       passenger trains.                                   further boost capacity in the CIC Section, improving connectivity
       A key benefit of this expansion is the improved supply chain   to NKJ (New Katni Junction) station and extending beyond Pendra
       management,  particularly  in  facilitating  the  movement of   station for Northern India. SECR’s ongoing investments also aim to
       empty freight rakes for loading at coal mines in the Shahdol   enhance connectivity and generate employment opportunities.
       and Sohagpur area.                                  For instance, the ongoing construction of Bridge No. 196 across
       This enhancement is crucial for supporting operations at industrial   the Chhota Mahanadi river underscores these efforts, promising
       facilities like the MB Power plant in Jaithari, which plays a pivotal   enhanced mobility across the region.
       role in local employment generation.                In summary, the addition of the third line at Mudaria Railway
       Furthermore, the new infrastructure at Mudaria Railway Station is   Station and SECR’s proactive infrastructure initiatives are set to
       expected to benefit local businesses such as the Orient Paper   elevate punctuality, efficiency, and connectivity, laying a solid
       Mill in Amlai and facilitate cement loading at Rupaund. These   foundation for regional economic growth and prosperity.

       RAMKY INFRASTRUCTURE LIMITED BAGS CONTRACTS         in the Zanskar Region along with the Loss Reduction works in the
       WORTH  `131.19 CRORES IN THE UNION TERRITORY OF     Leh and Kargil Districts of UT of Ladakh.
                            LADAKH                         The scope of the project broadly involves the construction and
       Ramky Infrastructure Limited a leading organization in the   commissioning of seven 66KV electricity substations, 70 km of new
       realm of infrastructure development has received two orders to   electricity distribution lines, 550 km of reconditioning by AB cable,
       implement the distribution of the infrastructural works of Ladakh   and the installation of approximately 400 distribution transformers.
       Power Development Department from Power Grid Energy Services   On receiving the contracts in the northernmost union territory of
       Limited. The first contract worth `107.39 Cr (Excluding GST) and the   India, Y. R. Nagaraja,  Managing Director of Ramky Infrastructure
       second contract worth `23.80 Cr (Excluding GST) for the supply of   Limited said “We are pleased to be
       plant and installation services respectively, in the districts of Leh &   awarded to execute the contracts for the
       Kargil of UT of Ladakh.                             loss reduction works in the Leh district of
       PowerGrid Energy Services Limited, a wholly-owned subsidiary of   the Ladakh union territory as it reflects our
       PowerGrid Corporation of India Limited has awarded the contracts   commitment and adherence to quality
       to Ramky Infrastructure Limited to be executed over a period of 30   standards. This project enhances our
       months. The contracts were awarded for the loss reduction work   capability to develop urban infrastructure
       under the Revamped (results-linked) Distribution Sector Scheme   projects in challenging and complex terrains. We look forward to
       (RDSS) in the Leh district.                         executing the contract by late 2027 or early 2028.
       The RDSS scheme is intended to minimize the Aggregate Technical   The government aims to improve operational efficiency and
       & Commercial (AT&C) losses in Ladakh, which are projected to   financial sustainability through these projects. They will offer
       be reduced from 49.04% in 2021-22 to 27.85% by 2024-25. With   result-based financial aid to DISCOMs for strengthening supply
       a sanctioned cost of `687.05 Crores, the RDSS includes the Grid   infrastructure, contingent on meeting pre-qualifying criteria and
       connectivity of the Changthang Region, Downline infrastructure   achieving fundamental benchmarks.

         EXPANSION OF METRO SERVICE ON NEW GARIA TO        is progressing smoothly, aiming to enhance connectivity
                  AIRPORT CORRIDOR IMMINENT                and alleviate traffic congestion between New Town, Rajarhat
       Construction activities are progressing swiftly across various   townships, and other parts of Kolkata. Significant strides have
       Kolkata Metro stations along the New Garia-airport corridor, with   been made along the stretch from the IT hub to City Centre-II,
       plans to extend train services up to Beleghata soon. Currently,   with 90% of civil engineering completed and ongoing installations
       trains are operational on the 5.40 km stretch from New Garia   of electrical, signal, and telecommunications systems.
       (Kavi Subhash) to Ruby More (Hemanta Mukhopadhyay) stations,   The Orange Line, comprising 10 stations, integrates local art
       following their inauguration by Prime Minister Narendra Modi in   and cultural elements with modern technology. Each station is
       March. Additional 4.39 km extension to Beleghata has received   equipped with essential passenger amenities such as escalators,
       clearance after thorough safety evaluations, and commercial   lifts, staircases, drinking water facilities, toilets, modern platforms,
       services on this extended segment are slated to commence   automatic smart card recharge machines (ASCRM), public
       shortly.                                            address systems, digital display boards, emergency lighting, and
       Meanwhile, work on the entire 28.90 km Orange Line corridor   tactile floor indicators for the visually impaired.


                                                                         JUNE 2024|CONSTRUCTION OPPORTUNITIES  43
   38   39   40   41   42   43   44   45   46   47   48