Page 41 - Construction_Opportunities_June_2024
P. 41

TICKER TAPE
              DELHI METRO STATION TO FEATURE THREE           GOA REQUESTS `700 CRORE FOR WATER PROJECTS,
            INTERCHANGES WITH GREEN LINE EXPANSION            `300 CRORE FOR ST XAVIER’S RELICS EXPOSITION
       The New Delhi Metro station is set to become a triple interchange   Pramod Sawant, Chief Minister of Goa has requested  `700
       facility with the expansion of the Green Line from Inderlok to   crore from the Centre for water augmentation projects and an  INFRASTRUCTURE
       Indraprastha, officials announced on Sunday. This 12.37 km   additional `300 crore for the decennial exposition of St. Francis
       extension will build upon the existing Brigadier Hoshiar Singh -   Xavier’s relics. Sawant made this appeal during a pre-budget
       Inderlok Green Line corridor, which spans 28.78 km.  meeting chaired by Union Finance Minister Nirmala Sitharaman
       The  New  Delhi  station  will  serve  as  an  interchange  for  three   in New Delhi recently, emphasizing that these initiatives are crucial
       lines: Yellow, Orange (Airport Line), and now the Green Line. This   for Goa’s development. The relics of St. Francis Xavier are housed
       development will significantly enhance connectivity across the   at the Basilica of Bom Jesus in Old Goa, near the state capital,
       city, allowing commuters from Bahadurgarh and parts of west   Panaji. The exposition is scheduled from November 21, 2024, to
       Delhi, including Nangloi, Rajdhani Park, and Udyog Nagar, to travel   January 5, 2025, and attracts lakhs of visitors from around the world
       directly to the New Delhi railway station, which is adjacent to the   every ten years. In the meeting, Sawant highlighted the need for a
       New Delhi Metro station.                            `300 crore grant for the exposition, stating its importance for both
       Officials highlighted that this expansion will improve access to the   cultural and religious tourism in Goa. Additionally, he sought `700
       New Delhi station and help reduce congestion, as more people   crore for water augmentation projects and financial support for the
       are expected to prefer metro travel over road transport. The new   Konkan Railway to enhance connectivity and stimulate economic
       Green Line extension will be underground, similar to the existing   growth in the state. “The chief minister said these initiatives are
       New Delhi station.                                  essential for Goa’s development, and he expressed certainty that
       Currently, Kashmere Gate is the only triple interchange station in   they will be included in the upcoming Union Budget 2024-2025,”
       the Delhi Metro network, connecting the Yellow, Red, and Violet   the Chief Minister’s Office (CMO) stated. Sawant, who also oversees
       lines. With Phase 4 of the metro expansion, three more stations—  the state finance department, was in Delhi to participate in both
       Lajpat Nagar, Azadpur, and New Delhi—will also become triple   the GST Council meeting and the pre-budget session led by the
       interchange facilities.                             Union finance minister.
       As part of Delhi Metro’s Phase 4 expansion, approximately 86
       kilometers of new lines are being constructed. Construction is   BENGALURU TO GET SECOND AIRPORT: POTENTIAL
       underway on three lines: Janakpuri West - RK Ashram Marg (Violet),   LOCATION REVEALED
       Majlis Park - Maujpur (Pink), and Aerocity - Tughlakabad (Golden),   Karnataka’s Infrastructure Development Minister MB Patil has
       with over 50 percent of civil work completed on these sections.  directed  officials to prepare  a feasibility report  for a second
       Earlier this year, two additional corridors—Inderlok - Indraprastha   commercial airport in Bengaluru to meet the city’s future needs.
       and Saket G Block - Lajpat Nagar—received approval. The Delhi   In a meeting with key department officials, Patil emphasized
       Metro Rail Corporation (DMRC) is currently processing statutory   the necessity of a new airport to support the rapidly growing
       clearances, including land acquisition from DDA, CPWD, and PWD,   metropolis. Attending the meeting were N Manjula, Secretary of
       as well as forest clearances.                       the Infrastructure Development Department, BC Satish, Managing
       Further steps, including planning and tendering for civil works, are   Director of Karnataka Industrial Infrastructure Development
       being undertaken before proceeding with specialized contracts   Corporation, and DP Prakash, Executive Director.
       for track laying, electrical systems, signaling, and other technical
       components, officials added.                        INDIAN RAILWAYS SUCCESSFULLY CONDUCTS FULL TRAIN
                                                            TRIAL RUN ON WORLD’S HIGHEST CHENAB RAIL BRIDGE
       DHADHAR RIVER BRIDGE CONSTRUCTION FOR MUMBAI-       Indian Railways has successfully conducted a full trial run on the
          AHMEDABAD BULLET TRAIN PROJECT COMPLETED         newly constructed Chenab Rail Bridge, the world’s highest railway
       The construction of a bridge over the Dhadhar river in Gujarat’s   bridge, connecting Sangaldan in Ramban district to Reasi. This trial
       Vadodara district has been completed, marking a significant   follows a successful engine trial run conducted recently.
       milestone in the Mumbai-Ahmedabad Bullet Train project. The   Union Railway Minister Ashwini Vaishnaw announced the successful
       National High Speed Rail Corporation Ltd (NHSRCL) announced on   electric engine trial, highlighting the progress: “The first trial train
       Saturday that the 120-meter bridge features three full-span girders   has successfully run from Sangaldan to Reasi, including crossing
       of 40 meters each and several circular piers ranging from 16 to 20   the Chenab Bridge. All construction works for the USBRL are nearly
       meters in height and 4 to 5 meters in diameter.     finished, with only tunnel No. 1 remaining partially incomplete.”
       Located between Bharuch and Vadodara, the bridge is one of   The 46-km Sangaldan-Reasi stretch is set for inspection over two
       24 river bridges along the Bullet Train corridor, with 20 in Gujarat   days by Commissioner of Railways Safety (CRS) D C Deshwal, as
       and four in Maharashtra.                            the ministry approaches the completion of this ambitious project.
       According to a press statement, “The construction of seven river   The Chenab Bridge, constructed at a cost of `14,000 crore, aims
       bridges has already been completed. These rivers are Par, Puma,   to address numerous connectivity challenges in Jammu and
       Mindhola, Ambika, Auranga, Venganiya, and Mohar.”   Kashmir by providing reliable connections in difficult weather and
       Indian Railways has previously announced that the first phase   terrain. This bridge is part of the `35,000 crore Udhampur-Srinagar-
       of the bullet train project, running between Surat and Bilimora in   Baramulla Railway Link (USBRL) project, which seeks to significantly
       Gujarat, is expected to be operational by 2026.     enhance connectivity in the region.


                                                                         JUNE 2024|CONSTRUCTION OPPORTUNITIES  41
   36   37   38   39   40   41   42   43   44   45   46