Ready to build 500 x 500 mm Box Section from APL APPOLO TUBES
The Biggest Revolution in PEB Structures
India has the second fastest growing economy in the world and a lot of it is attributed by its construction industry. In this steadfast development, the construction industry has discovered, invented and developed a number of technologies, products and new concepts. The journey of construction industry has changed many folds over the years and Tubular Construction is one of the latest and rapidly growing technology. One can easily say that Tubular steel structures is the future of Construction.
To make this concept even more efficient, APL Apollo is proud to announce that it is now coming up with the biggest ever facility in Raipur-Chhattisgarh, first time ever in India, the company is launching ready Box Sections to make the tubular construction faster, better and more efficient than ever.
APL Apollo is the first ever company in India to produce ready square box sections of size 500x500mm and 20mm thickness.
Earlier, these sections of such large diameter were made manually, heavy plates were transported, stored, cut and welded from all the four sides, which increased the overall time of the project, and led to increase in overall cost that too with a compromise to the quality.
Now, these ready box sections are available in nick of time with APL Apollo’s cutting edge technology, with no compromise in quality. The company’s world class technology has a capacity of producing large quantity of tubes in a day in cut to length sizes, with minimum wastage, less lead time and more uniformity.
Why Apollo Box Sections?
Unlimited Availability
APL Apollo has large capacity of producing tubes, which ensures quick availability of ready box sections in nick of time.
Lower lead time of its technology ensures no delays in project deadlines and faster construction, reducing the overall project time and cost.
Speed
Manually welded box section is time intensive and has less dependability as compared to machine made box sections. High Rise buildings and mega factory/warehouse buildings can now be made faster than ever, lower project timelines reduces the overall costs and faster construction ensures faster IRR.
Better Quality
The company is ISO 9002 and ISO 9001 certified, so when it comes to quality, there’s no question of compromise. Machine made tubes has better uniformity and quality assurance as compared to the manually welded box sections. APL Apollo’s Direct Forming technology, ensures minimum wastage, lower lead time and cut to length sizes, so that the fabrication is much easier.
More Carpet Area
Other sections require RCC encasing to get smoother edges and appealing aesthetics, additionally shuttering and de shuttering is required to support the structure. Square hollow sections have smooth edges and better aesthetics than I-sections they do not require encasing or shuttering, to get the best of both the world, concrete can be filled inside the tube, giving more space in the structure.
No on Ground Fabrication
Structural Steel Tubes reduce the overall fabrication time, as APL Appolo’s tubes are pre-fabricated, precisely engineered and cut to length. There is little or no on-site fabrication required which accelerates the construction process.
Environment Friendly
Construction sector contributes 30% of direct and indirect Co2 emissions. Structural steel is preferred for construction as steel is infinitely recyclable and is easy to pre fabricate. Research indicates replacing reinforced concrete with steel structures can reduce emission by 60% as there’s no air pollution and less water consumption.
For more details contact:
Email: info@aplapollo.com
Website: www.aplapollo.com