                                          Vögele mobile power feeder


                                           increasing footprints in india



           State of the art technology   India has the second-largest road network   Job Site: Delhi – Mumbai Expressway
                from Vögele, absolute    in the world, spanning a total of 6.39 million   1350 km Delhi – Mumbai Expressway
               power for large jobsites  kilometres (kms) as per Economic Survey   (DME) project (NH-148N / NE-4) is an under
                                         2021. This road network transports 64.5% of   construction 8 lane access-controlled road
                                         all goods in the country and 90% of India’s   with a route connecting DND in Delhi with JNPT
                                         total passenger traffic uses road network to   in Mumbai. It has been designed with a speed
                                         commute.                             limit of 120 km/hr and provision to expand to
                                         The National Infrastructure Pipeline of which   12 lanes in the future.
                                         Bharatmala Pariyojna is a part, have also   This new greenfield expressway was approved
                                         accelerated the construction of several   for construction under the Bharatmala
                                         Greenfield projects including the Expressways   Pariyojana programme in 2017. This being a
                                         & mega highways. With such humongous   mega Green Field project is one of the ideal
                                         ongoing and targeted construction of road   project site for use of Mobile Feeder although
                                         infra in the country, it becomes more pertinent   the following prerequisite was checked/ensured
                                         for the use of state of the art -innovative   before machine was physically moved to job
                                         technologies for cost optimisation and quality   site.
                                         results.                             1.  Total quantity of Asphalt to be paved
                                         VÖGELE Mobile Power feeder offers cutting-  2.  Current Paving methodology for 8 Lane
                                         edge technology that sets standards in   carriageways of 18.75 mtr width
                                         modern road construction both in terms of   3.  Batch (Hot Mix) Plant Capacity
                                         quality and economic efficiency. This mobile   4.  Availability of the paving front or length
                                         feeder not only continues to gain popularity   5.  Per day paving target (qty & length)
                                         for use in large highway projects but has also   6.  Average lead of the paving site from plant
                                         exponentially contributed to deliver excellent   location
                                         paving results.                      7.  Availability and type of trucks used in
                                         Since 2006, the VÖGELE Mobile Power feeders,   Asphalt Mix Transport
                                         are in use in various National Highway Projects   It was more interesting to have this jobsite
                                         in state of Haryana, Rajasthan, Uttar Pradesh   because the opportunity was to use Mobile
                                         & Gujarat.                           Feeder on one units of Vogele Asphalt Paver