CASE STUDY
                                  PROJECT - KARTARPUR CORRIDOR   CHALLENGE
                                  PASSANGER TERMINAL AT DERA BABA
                                  NANAK, PUNJAB            The project was scheduled to be inaugurated as per the defined timeline. But
                                  CONSULTANT - CREATIVE GROUP  the contractors of the project, were running behind time with their approved
             CASE STUDY           CONTRACTOR - SHAPORJI PALLONJI & CO.   vendors for supplying structural pipes & tubes. However, approved vendors
                                                           were unable to cater to the demand due to shorter lead time.
                                  PVT. LTD.
       39    APL Apollo           YEAR - 2019                     SOLUTION   REGULARS
                                                                   Creative Group & Shapoorji  Pallonji  & Co.  Pvt. Ltd.
             completes Kartarpur Corridor                          approached APL Apollo Tubes and requested to supply
                                                                   the required structural pipes & tubes in the given time
                                                                   frame.  The  principals  to  the  project  –  Land  Port
             project with great precision                          Editor’s Space  ................................4
                                                                   Authority of India, a part of Ministry of Home Affairs,
                                                                    were approached by APL Apollo along with Creative
                                                                   Findex.............................................8
                                                                    Group & Shapoorji Pallonji & Co. to get the approval.
                                                                    The LOI was provided by Shapoorji Pallonji & Co.
                                                                    itself. A presentation was made by APL Apollo to the
                                                                   Ticker Tape  ................... 24,30,40,46
                                                                    concerned authorities which highlighted the
                                                                                    with
                                                                                      the
                                                                           capabilities
                                                                                along
                                                                     manufacturing
                                                                     credentials of the company.
                                                                   Opportunities Zone ..................50,51
                                                                     RESULTS AND CONCLUSION
                                                                   Contract Awarded ...................52,53
                                                                     APL Apollo was given a pre-approval on the 24th
                                                             July 2019 & an LOI on the 26th July 2019 to supply structural pipes. APL
                                  ABOUT THE PROJECT          Apollo started dispatches from  the 27th July 2019 and had supplied
                                                                   Executive Connect .......................54
             POST EVENT REPORT    Kartarpur Corridor has been one of our most prestigious   approximately 500 Tons out of the total requirement of 615 Tons within
                                                             7 days of LOI. With APL Apollo Tube’s faster delivery, pan India flexibility
                                  projects, as it is a gateway for pilgrims to visit the
                                                              on sizes and proximity of plant locations, the company was able to
                                  Gurudwara Kartarpur Sahib in Pakistan. The project was
       48    CCMA                 under the limelight of different international and national   complete the project with great precision.
                                  media houses as this project has been a stepping stone
                                  towards improving ties between the two countries.